RAPID WEB TESTING IN A
HIGH-VELOCITY ENVIRONMENT

Download: Presentation.pdf    

Cover

Introduction

The Problem


The Solution


What METS is

Foundational METS Concepts

Getting Started


Physical Test Grid Sample

Build the Functional Test Grid

Estimating the time budget

Lets Review

Taking that First Step

Contact Information

 
     
Another way to look at it…
  Create a second spreadsheet breaking each Functional Test Grid entry into a separate line. Then add columns for Time Required and Potential Severity and enter this information for each column.
 

Test

Category

Importance

Time Required

Potential Severity

Creating an account possible

Accounts

Critical

5

1

Logging into an account possible.

Accounts

Critical

1

1

Can user change account details such as shipping address.

Accounts

High

5

3

Can user request forgotten login information?

Accounts

High

5

3

Can user delete an account?

Accounts

Medium

3

3

Does account time out require re-login after specified inaction?

Accounts

Medium

10

3

Is the user notified when why they must re-login?

Accounts

Low

10

4

Can an item be placed into the cart?

Shopping Cart

Critical

1

1

Can an item be removed from the cart?

Shopping Cart

Critical

2

2

Can multiple items be put into shopping cart?

Shopping Cart

High

2

2

The Time Required information can be estimated using the Physical Test Metrics spreadsheet. Remember, you have estimated the time it takes to check various physical attributes of your application.

 

Download: Presentation.pdf